Nodes at the Activity level are linked with lines by default and are used to illustrate the flow of Activity content and instructions. However, you can add additional lines if needed.

  1. Hover over a node to see 3 or more dots (O). 
  2. Click on a dot (O) and drag to connect to a dot on another node. This action links the two nodes by creating a line that ends with an arrow.